| NO | PROJECT DESCRIPTION | CONTRACT / PO NO | CLIENT | VALUE (RM) | COMPLETE DATE |
| 1 | Perlaksanaan Projek Rangkaian Tempatan Telekom Malaysia Berhad Secara Jadual Kadar Harga. | KJS 4003/2006 | TM Berhad | 10,000,000.00 | 23.01.2007 |
| 2 | Perlaksanaan Projek Rangkaian Tempatan Telekom Malaysia Berhad Secara Jadual Kadar Harga | K.JS 4001/05 | TM Berhad | 5,000,000.00 | 31.01.2007 |
| 3 | Perlaksanaan Projek Rangkaian Tempatan Telekom Malaysia Berhad Secara Jadual Kadar Harga | 3200000261 | TM Berhad | 10,000,000.00 | 14.02.2009 |
| 4 | Perlaksanaan Projek Rangkaian Tempatan Telekom Malaysia Berhad Secara Jadual Kadar Harga | 3200000397 | TM Berhad | 10,000,000.00 | March 2010 |
| 5 | Perlaksanaan Projek Rangkaian Tempatan Telekom Malaysia Berhad Secara Jadual Kadar Harga | 3200000508 | TM Berhad | 5,000,000.00 | April 2010 |
| NO | PROJECT DESCRIPTION | CONTRACT / PO NO | CLIENT | VALUE (RM) | COMPLETE DATE |
| 1 | Civil & Structure Maintenance : Proposed Rectification Work For Slope Failure & Other Related M&E Works At Gunung Ledang, Tangkak, Johor | NP 35463 | Celcom (M) Berhad | 365,000.00 | 27.02.2007 |
| 2 | Fiber Optic Preventive Maintenance : Relocation Of Civil & Fiber Optic Netwok Due To Road Upgrading By Local Authority JKR At Taman Perling, Johor | NP 38628 | Celcom (M) Berhad | 335,000.00 | 29.08.2007 |
| 3 | Fiber Optic Preventive Maintenance : Relocation Of Civil & Fiber Optic Netwok At Jln Skudai- Pontian & Jln Perling , Johor Due To Road Upgrading By Local Authority (JKR) | NP 42714 | Celcom (M) Berhad | 225,000.00 | March 2008 |
| 4 | Fiber Optic Upgrading Backbone : Supply, Delivery, Construction, Installation, Testing & Commissioning Of Civil Infrastructure For Tampoi (SMX) - Bukit Lunchu | NP 37650 | Celcom (M) Berhad | 1,300,000.00 | Okt 2008 |
| 5 | 2G-Relocation (Infra & Cable) Preventive Maintenance Work. To Relocate Fiber Optic Network (civil & cable) At Sg. Melaka , Jln Hang Tuah, Melaka. | NP 56684 | Celcom (M) Berhad | 395,000.00 | April 2009 |
| 6 | Supply , Delivery , Construction , Installation , Testing And Commissioning Of Civil Infrastructure Fiber Optic Cable Works For Link Wisma Daiman - SMX Tampoi | NP 53320 | Celcom (M) Berhad | 1,182,867.05 | Oct 2009 |
| 7 | 3G-Transmision Operation Relocation Of Fiber Optic Network At Jalan Datin Halimah , Johor Bahru Due To Road Upgrading By Local Authority | NP 55466 | Celcom (M) Berhad | 410,000.00 | Jan 2011 |
| NO | PROJECT DESCRIPTION | CONTRACT / PO NO | CLIENT | VALUE (RM) | COMPLETE DATE |
| 1 | Supply & Engineering Works From Existing FEDB To EDS At BCB Training Centre Bangi | KT 005/07 | Fiberail Sdn Bhd | 549,819.96 | 01.03.2007 |
| 2 | Supply & Engineering Services From Existing MH 12 To Menara Standard Chartered At Raja Chulan Kuala Lumpur | KT 012/07 | Fiberail Sdn Bhd | 197,896.16 | 01.06.2007 |
| 3 | Supply & Engineering Services From Existing CSA Manhole To Menara Merais, Petaling Jaya | KT 035/07 | Fiberail Sdn Bhd | 655,833.74 | 15.06.2007 |
| 4 | Supply & Engineering Works From Menara Olympia To Menara Ambank At Jalan Raja Chulan, Kuala Lumpur | KT 030/07 | Fiberail Sdn Bhd | 455,420.22 | 09.07.2007 |
| 5 | Supply & Engineering Works From Menara Ambank To Aims At Menara Aik Hua, Kuala Lumpur | KT 031/07 | Fiberail Sdn Bhd | 473,868.55 | 09.07.2007 |
| 6 | Supply & Engineering Works From Jalan Jelatek To Menara Great Eastern At Jalan Ampang | KT 017/06 | Fiberail Sdn Bhd | 614,582.61 | 09.07.2007 |
| 7 | Supply & Engineering Works From OCBC Bank To Menara Olympia At Jalan Raja Chulan, Kuala Lumpur | KT 029/07 | Fiberail Sdn Bhd | 412,099.74 | 10.07.2007 |
| 8 | Supply & Engineering Services From GPO Dayabumi To OCBC Bank Jalan Tun Perak, Kuala Lumpur | KT 032/07 | Fiberail Sdn Bhd | 476,822.52 | 15.07.2007 |
| 9 | Supply & Engineering Works From Existing FSB Handhole To MITV At Berjaya Times Square | KT 078/07 | Fiberail Sdn Bhd | 154,140.60 | 10.11.2007 |
| 10 | Relocation Of 1st Cable At Link Kempas Baru Johor(KTMB CH 746.75 - CH 756.00) | KT 098/07 | Fiberail Sdn Bhd | 568,391.43 | 19.01.2008 |
| 11 | Permenant Relocation Of Fiber Optic Cable At Johor Bahru Central | (121)FSB/LA | Fiberail Sdn Bhd | 263,988.79 | 20.01.2008 |
| 12 | Repair Work For 1st Cable From Kempas Baru To Plentong (CH 0.00 - CH 10.00) | KT 099/07 | Fiberail Sdn Bhd | 573,524.71 | March 2008 |
| 13 | Relocation Of 2nd Cable At Link Kempas Baru To Plentong (KTMB CH 2.00 - CH 10.00) | KT 097/07 | Fiberail Sdn Bhd | 513,275.08 | April 2008 |
| 14 | Installation Of FOC From Jaring To Astro Building At Lebuhraya Sg. Besi - Puchong | KT 060/08 | Fiberail Sdn Bhd | 368,738.45 | Oct 2008 |
| 15 | Installation Of FOC From FEDB Astro To Serdang KTMB Station | KT 059/08 | Fiberail Sdn Bhd | 215,919.93 | Nov 2008 |
| 16 | Permanent Relocation Of OFC At Gerbang perdana Johor Bahru. | (7108)FSB/LA/L.A | Fiberail Sdn Bhd | 200,800.33 | Jan 2009 |
| 17 | Installation Of FOC From Menara Sarawak (MSC Cyberport) To KTMB Johor Bahru. | (8508)FSB/LA/L.A | Fiberail Sdn Bhd | 776,751.21 | Jan 2009 |
| 18 | Cable Works From Wisma Green Packet to KTMB Dato Hurun Station, Petaling Jaya | KT 053/09 | Fiberail Sdn Bhd | 822,329.31 | Sept 2009 |
| 19 | Relocation of Fiber Optic Cable at Seremban – Taboh Naning Between KP119.000 – KP 121.000 | KT 001/10 | Fiberail Sdn Bhd | 205,089.72 | Feb 2010 |
| 20 | Engineering Works From Maxis Tower to ML409 Ayer Tawar,Perak | KT 051/10 | Fiberail Sdn Bhd | 950,758.39 | Dec 2010 |
| 21 | Civil Work from existing MH at Mex Office Cyberjaya to last Existing Manhole at Bulatan Kg Pandan | (5411)FBS/LA/L.A | Fiberail Sdn Bhd | 905,624.80 | Jan 2012 |
| 22 | Civil Work From NTT to Existing Manhole at Maju Expressway | (5111)FBS/LA/L.A | Fiberail Sdn Bhd | 990,548.25 | Jan 2012 |
| 23 | Civil Work from Patimas to Existing Manhole at Maju Expressway | (5211)FBS/LA/L.A | Fiberail Sdn Bhd | 422,476.40 | Jan 2012 |
| 24 | Civil Work From AIK HUA to Last Existing Manhole at Bulatan Kg Pandan | (5311)FBS/LA/L.A | Fiberail Sdn Bhd | 820,470.85 | Jan 2012 |
| NO | PROJECT DESCRIPTION | (KM) | CONTRACT / PO NO | CLIENT | CUSTOMER | VALUE (RM) | COMPLETE DATE |
| 1 | Electrified Double Track Project Between Ipoh To Padang Package N4 -(Horizontal Direct Drilling)LOA NO 1 | 4.003 | (7708)FSB/LA/L.A | FIBERAIL SDN BHD | MMC GAMUDA JV SDN BHD | 772,058.61 | Dec 2007 |
| 2 | Electrified Double Track Project Between Ipoh To Padang Besar Package N2 - (HDD) | 7.581 | (126) FSB/LA/L.A | FIBERAIL SDN BHD |
MMC GAMUDA JV SDN BHD |
1,969,647.47 | Dec 2007 |
| 3 | Electrified Double Track Project Between Ipoh To Padang Besar Package N4 - Construction & Completion Of Fiber Optic Cables Relocation Work (Engineering Services) | 35.802 | (113)FSB/LA | FIBERAIL SDN BHD | MMC GAMUDA JV SDN BHD | 1,423,126.50 | 15.01.2008 |
| 4 | Electrified Double Track Project Between Ipoh To Padang Besar Package N4 - Construction & Completion Of Fiber Optic Cables Relocation Work (Horizontal Direct Drilling) | 6.048 | (114)FSB/LA | FIBERAIL SDN BHD | MMC GAMUDA JV SDN BHD | 1,166,477.76 | 15.01.2008 |
| 5 | Electrified Double Track Project Between Ipoh To Padang Besar Package N2 -( Engineering Services) LOA NO 1 | 4.104 | 3908) FSB/LA/L.A | FIBERAIL SDN BHD | MMC GAMUDA JV SDN BHD | 324,342.00 | Jan 2008 |
| 6 | Electrified Double Track Project Between Ipoh To Padang Besar Package N2 - Construction & Completion Of Fiber Optic Cables Relocation Work (Engineering Services) | 57.060 | 125)FSB/LA | FIBERAIL SDN BHD | MMC GAMUDA JV SDN BHD | 1,728,801.30 | March 2008 |
| 7 | Electrified Double Track Project Between Ipoh To Padang Besar Package N1 -( Horizontal Direct Drilling -HDD)) | 3.539 | (1508)FSB/LA/L.A | FIBERAIL SDN BHD | MMC GAMUDA JV SDN BHD | 980,066.93 | March 2008 |
| 8 | Electrified Double Track Project Between Ipoh To Padang Besar Package N1 -( Engineering Service)) | 30.756 | (1408)FSB/LA/L.A | FIBERAIL SDN BHD | MMC GAMUDA JV SDN BHD | 1,083,481.60 | March 2008 |
| 9 | Ipoh To Padang Besar Package N1 -( Engineering Service) | 3.723 | (6308)FSB/LA/L.A | FIBERAIL SDN BHD | MMC GAMUDA JV SDN BHD | 297,480.00 | March 2008 |
| 10 | Ipoh To Padang Besar Package N4 - Construction & Completion Of Fiber Optic Cables Relocation Work (Engineering Services) | 2.277 | (7608)FSB/LA/L.A | FIBERAIL SDN BHD | MMC GAMUDA JV SDN BHD | 67,557.00 | Jan 2008 |
| 11 | Ipoh To Padang Besar Package N4 - Construction & Completion Of Fiber Optic Cables Relocation Work(Engineering Services) - Pinang Tunggal | 3.156 | (9008)FSB/LA/L.A | FIBERAIL SDN BHD | MMC GAMUDA JV SDN BHD | 86,592.00 | Aug 2008 |
| 12 | Ipoh To Padang Besar Package N2 -(HDD) | 0.489 | (4008)FSB/LA/L.A | FIBERAIL SDN BHD | MMC GAMUDA JV SDN BHD | 94,313.43 | March 2008 |
| 13 | Ipoh To Padang Besar Package N1 -(Horizontal Direct Drilling -HDD) | 0.201 | (6408)FSB/LA/L.A | FIBERAIL SDN BHD | MMC GAMUDA JV SDN BHD | 38,766.87 | May 2008 |
| NO | PROJECT DESCRIPTION | (KM) | CONTRACT / PO NO | CLIENT | CUSTOMER | VALUE(RM) | COMPLETE DATE |
| 1 | Seremban To Gemas Package 1 -( KM 461.234 To KM 500.400)-ES | 22.728 | (5308) FSB/LA/L.A | FIBERAIL SDN BHD | IJM CONSTRUCTION SDN BHD | 878,000.00 | March 2009 |
| 2 | Seremban To Gemas Package 1 -( KM 461.234 To KM 500.400) - HDD | 4.000 | (5408) FSB/LA/L.A | FIBERAIL SDN BHD | IJM CONSTRUCTION SDN BHD | 1,151,392.48 | March 2009 |
| 3 | Seremban To Gemas Package 1 - Construction and Completion of Fiber Optic Cables Relocation Work (HDD Installation) | 1.128 | (1609) FSB/L.A/LA | FIBERAIL SDN BHD | IJM CONSTRUCTION SDN BHD | 217,557.36 | March 2009 |
| 4 | Seremban To Gemas Package 1 -Construction and Completion of Fiber Optic Cables Relocation Work (HDD Installation) | 11.839 | (1709) FSB/L.A/LA | FIBERAIL SDN BHD | IJM CONSTRUCTION SDN BHD | 2,283,387.63 | March 2009 |
| 5 | Seremban To Gemas Package 1 -Construction and Completion of Fiber Optic Cables Relocation Work (HDD Installation) | 4.809 | (1909) FSB/LA/L.A | FIBERAIL SDN BHD | IJM CONSTRUCTION SDN BHD | 940,056.11 | March 2009 |
| 6 | Seremban To Gemas Package 1 -Construction and Completion of Fiber Optic Cables Relocation Work (Engineering Services) | - | (2009) FSB/LA/L.A | FIBERAIL SDN BHD | IJM CONSTRUCTION SDN BHD | 50,049.00 | March 2009 |
| 7 | Seremban To Gemas Package 1 -Construction and Completion of Fiber Optic Cables Relocation Work (Engineering Services) | 3.534 | (7309)FSB/LA/L.A | FIBERAIL SDN BHD | IJM CONSTRUCTION SDN BHD | 121,540.90 | November 2009 |
| 8 | Seremban To Gemas Package 1 –Horizontal Direct Drilling (HDD) Installation Works | 4.446 | (7409)FSB/LA/L.A | FIBERAIL SDN BHD | IJM CONSTRUCTION SDN BHD | 932,765.70 | November 2009 |
| 9 | Electrified Double Track Project -Seremban To Gemas Package 1 –Horizontal Direct Drilling (HDD) Installation Works Section 6 (CH497.300-CH500.770) | 2.560 | (8009)FSB/LA/L.A | FIBERAIL SDN BHD | IJM CONSTRUCTION SDN BHD | 554,676.56 | December 2009 |
| 10 | Electrified Double Track Project - Seremban To Gemas Package 1 –Construction and Completion of Fiber Optic Cables Relocation Work (Engineering Services) Section 6 (CH497.300-CH500.770) | 4.552 | (7909)FSB/LA/L.A | FIBERAIL SDN BHD | IJM CONSTRUCTION SDN BHD | 125,250.80 | December 2009 |
| 11 | Electrified Double Track Project -Seremban To Gemas Package 1 –Horizontal Direct Drilling (HDD) Installation Works–Additional No 6 | 1.820 | (0210)FSB/LA/L.A | FIBERAIL SDN BHD | IJM CONSTRUCTION SDN BHD | 379,696.04 | January 2010 |
| 12 | Seremban To Gemas Package 1 - Construction and Completion of Fiber Optic Cables Relocation Work(Engineering Services | 1.692 | (0110)FSB/LA/L.A | FIBERAIL SDN BHD | IJM CONSTRUCTION SDN BHD | 53,309.00 | November 2009 |
| 13 | Electrified Double Track Project -Seremban To Gemas Package 1 – Horizontal Direct Drilling (HDD) Installation Works–Additional No 7 | 1.080 | (0410)FSB/LA/L.A | FIBERAIL SDN BHD | IJM CONSTRUCTION SDN BHD | 244,140.40 | January 2010 |
| 14 | Seremban To Gemas Package 1 -Construction and Completion of Fiber Optic Cables Relocation Work (Engineering Services) | 2.648 | (0310)FSB/LA/L.A | FIBERAIL SDN BHD | IJM CONSTRUCTION SDN BHD | 67,498.50 | December 2009 |
| 15 | Electrified Double Track Project -Seremban To Gemas Package 1–Construction and Completion of Fiber Optic Cables Relocation Work (Engineering Services) Section 7 ( CH482.410-CH486.070 &CH488.450-CH490.300 ) | 8.292 | (1510)FSB/LA/L.A | FIBERAIL SDN BHD | IJM CONSTRUCTION SDN BHD | 209,960.00 | March 2010 |
| 16 | Electrified Double Track Project -Seremban To Gemas Package 1–Horizontal Direct Drilling(HDD) Installation Works Section 7 (CH482.410-CH486.070 & CH488.450-CH490.300) | 3.380 | (1610)FSB/LA/L.A | FIBERAIL SDN BHD | IJM CONSTRUCTION SDN BHD | 741,502.60 | March 2010 |
| 17 | Electrified Double Track Project -Seremban To Gemas Package 2–Construction and Completion of Fiber Optic Cables Relocation Work (Engineering Services) Section 2A (CH500.775-CH504.141 & CH505.150-CH506.990) | 8.390 | (1810)FSB/LA/L.A | FIBERAIL SDN BHD | ATURAN PRISMA SDN BHD | 210,478.10 | March 2010 |
| 18 | Electrified Double Track Project -Seremban To Gemas Package 2 –Horizontal Direct Drilling (HDD) Installation Works Section 2A (CH500.775-CH504.141 & CH505.150-CH506.990) | 2.200 | (1710)FSB/LA/L.A | FIBERAIL SDN BHD | ATURAN PRISMA SDN BHD | 513,916.00 | March 2010 |
| NO | PROJECT DESCRIPTION | CONTRACT / PO NO | CLIENT | VALUE (RM) | COMPLETE DATE |
| 1 | Supply & Install of 7 way 100mm Dia HDPE Ducting By HDD Method and Telephone Manhole and Ducting for Cadangan Pembangunan Kampus Baru Universiti Kuala Lumpur (UniKL) Cawangan Johor Di Pasir Gudang Johor | TRC/WO/UniKL/312 | TRC Sdn. Bhd. | 245,310.00 | April 2010 |
| 2 | Genting Indahpura, Kulai Proposed Street Lighting Installation for 82 Unit Semi-Detached House, Package 3A at Zone 33 | GPC-K-1254/11/09 | GProperty Contruction Sdn. Bhd. | 106,070.30 | August 2010 |
| 3 | Genting Pura Kencana, Batu Pahat Proposed Street Lighting Installation for Phase 1A and Phase 1B | ALDC-SG-0938/08/09 | GProperty Contruction Sdn. Bhd. | 381,820.00 | September 2010 |
| 4 | Genting Pura Kencana, Batu Pahat Proposed Telephone Infrastructure Work for Phase 1A & Phase 1B. | ALDC-SG-0939/08/09 | GProperty Contruction Sdn. Bhd. | 344,864.50 | October 2010 |
| 5 | MAXIS NGBB Project Damansara Height Wsem FDC9 (DSH1 FDC9)-Microtrenching | 1031018257_1 | Huawei Technologies (M) Sdn Bhd | 214,736.20 | June 2011 |
| 6 | The Supply and provision of Underground Infrastructure, 48 Cores Optical fibre Cable and Accessories from TNB Seremban To Kilat For Telekom Malaysia Requirement | FCN/PCM/LOA/KOMASI/ 23-11/MM | Fibrecomm Network (M) Sdn Bhd | 433,645.50 | Aug 2011 |
| 7 | MAXIS NGBB Project Damansara Height Wsem FDC4-Microtrenching | 1031018257_3 | Huawei Technologies (M) Sdn Bhd | 208,981.34 | July 2011 |
| 8 | MAXIS NGBB Project Damansara Height Wsem FDC6-Microtrenching | 1031018257_4 | Huawei Technologies (M) Sdn Bhd | 216,343.13 | July 2011 |
| 9 | MAXIS NGBB Project Saujana Villa-Civil Work | 1031017857_5 | Huawei Technologies (M) Sdn Bhd | 280,341.87 | July 2011 |
| 10 | MAXIS NGBB Project HP Design (JY33) | 1031020411_1 | Huawei Technologies (M) Sdn Bhd | 130,328.04 | August 2011 |
| 11 | Civil Work (HDD) (DSH2 FDC1) | 1031017857_7 | Huawei Technologies (M) Sdn Bhd | 324,296.23 | August 2011 |
| 12 | Civil Work (Bangsar Permai) | 1031017857_4 | Huawei Technologies (M) Sdn Bhd | 213,441.86 | July 2011 |
| NO | PROJECT DESCRIPTION | CONTRACT / PO NO | CLIENT | VALUE (RM) | COMPLETE DATE |
| 1 | The Proposed Construction Of 65 Unit Double Storey Terrace House 22'x75' At Phase 5B & 7 Unit One And Half Storey Shop Office 20'x65' At Phase 5A1, Putra Heights, Mukim Damansara, Daerah Petaling, Selangor | FP/KE/07/P150 | Sime UEP Heights Sdn Bhd Main Contractor : Forum Power Sdn Bhd |
504,000.00 | 2007 |
| 2 | The Supply, Delivery, Installation, testing. Commissioning, Guarantee & Maintenance Of Street Lighting Work, Telekom Infra Work & Pipe Crossing For HT Work For Arterial Road (Jalan USJ Heights) Parcel A For Messrs Lengkap Teratai Sdn Bhd | FP/KE/07/P339 | Sime UEP Development Sdn Bhd Main Contractor : Forum Power Sdn Bhd |
481,500.00 | 2007 |
| 3 | Cadangan Penyelenggaraan Lampu Hiasan ,Lampu Taman & Lampu Hiasan Selama Dua (2) Tahun Di Kawasan Zon Kinrara C, Selangor Darul Ehsan | FP/KE/07/P421 | Majlis Perbandaran Subang Jaya Main Contractor : Forum Power Sdn Bhd |
358,460.00 | 2008 |
| 4 | Proposed Street Lighting And Service Duct Installation For GS Factory At Zone 28 | ALDC-K-0609/02/08 | ALD Construction Sdn Bhd | 378,000.00 | 2008 |
| 5 | Kerja-kerja merentang kabel Voltan tinggi 11KV MSVT-Pengalihan kabel 11KV berkaitan projek pemulihan PMU 132/11KV SJTJ P.Dickson. | 20290993 | Tenaga Nasional Berhad(TNB) | 56.250.00 | 2009 |
| 6 | Proposed Street Listing Installation for 82 Units Semi-Detached Houses, Package 3A at Zone 33 | GPC-K-1254/11/09 | GProperty Construction Sdn Bhd. | 106,070.30 | 2010 |
| 7 | Proposed Electrical LV Infrastructure Works at Zone 33A Package 3A for Semi-Detached Houses | GPC-K-1299/02/10 | GProperty Construction Sdn Bhd. | 219,912.98 | 2010 |
| 8 | Proposed Street Lighting Installation For Phase 1A and Phase 1B | ALDC-SG-0938/08/09 | ALD Construction Sdn Bhd | 381,820.00 | 2010 |
| NO | PROJECT DESCRIPTION | CLIENT | VALUE (RM) | COMPLETE DATE |
| 1 | The services and replaces Pipe Spool 12'' at Pasir Gudang Metering Station and Plentong Metering Station | GAS MALAYSIA | 100,007.00 | 2008 |
| 2 | Engineering Procument construction and commisioning of modification of bypass Installation at pasir Gudang metering Station for PGB Pasir gudang | GAS MALAYSIA | 200,500.00 | 2008 |
| 3 | Cadangan mambina dan menyiapkan Kompleks Penjara baru Pulau Pinang Di Atas Lot 126& 433 Mukim 6 & lot 201, sebahagian Lot 1348 & Mukim 7 daerah Seberang Prai Selatan Pulau Pinang | GAS MALAYSIA | 200,500.00 | 2008 |
| 4 | Engineering, Procument construction and commisioning of Lumut Southen Pipe Line networks 12'', 10'' Diesel Line and 10'' Bintumin Line from petronas Dagangan Berhad Depoh to Lumut port Jetty at kampung Acheh Perak. | GAS MALAYSIA | 100,450.00 | 2009 |
| NO | PROJECT DESCRIPTION | CONTRACT / PO NO | CLIENT | VALUE (RM) | COMPLETE DATE |
| 1 | OSP Civil HDD and Building Access to Proton COE, Jln TP, USJ Subang Jaya | 4500022892 | TIME dotCom Berhad | 131,068.00 | Dec 2009 |
| 2 | Proposed OSP civil to DIGI Cabin at Bandar Putra, Segamat Johor. | 4500024569 | TIME dotCom Berhad | 1,672,059.45 | July 2010 |
| 3 | Infra-DIGI at Parit Raja Industrial Park, Batu Pahat | 4500024553 | TIME dotCom Berhad | 2,116,161.80 | July 2010 |
| 4 | Fiber pulling to DIGI at Segamat,Johor | 4500024565 | TIME dotCom Berhad | 151,786.02 | July 2010 |
| 5 | Infra & fiber pull -(DIGI MSC PRO Kepong Ind Park) | 4500024256 | TIME dotCom Berhad | 491,298.19 | June 2010 |
| 6 | Infra & fiber - DIGI Cabin at Mimaland to MH at UIA Gombak (1 route) | 4500024257 | TIME dotCom Berhad | 581,327.20 | June 2010 |
| 7 | Fiber Pulling (IB 48C)- DIGI Project at Mimaland (Route 2) | 4500024258 | TIME dotCom Berhad | 1,072,413.02 | June 2010 |
| 8 | Infra-Proposed OSP civil to DIGI cabin at Gemerah, Segamat, Johor | 4500024321 | TIME dotCom Berhad | 131,729.24 | June 2010 |
| 9 | MENSA PROJECT:FTK Man Civil & Fiber Infrastructure at Kelana Jaya | 4500027708 | TIME dotCom Berhad | 1,547,393.21 | Jan 2012 |
| 10 | HERCULES PROJECT:FTK Man Civil & Fiber Infrastructure at SACC Shah Alam | 4500027709 | TIME dotCom Berhad | 2,875,146.74 | Jan 2012 |